News

Eureka Pumps awarded frame agreement with Eni Norge for Goliat

Categories: News
Comments Off on Eureka Pumps awarded frame agreement with Eni Norge for Goliat

goliat-341

Eureka Pumps AS has been awarded a service contract for pumps from   Eni Norge AS. The Frame Agreement is related to scope of work on the new built offshore production facility named Goliat.

Eureka Pumps shall provide support to Eni Norges’s offshore and onshore organization regarding service, overhaul and repair of pumps and related equipment, including but not limited to the following services:

  • Installation, commissioning and start-up assistance
  • On-site services
  • Onshore services
  • Spare parts
  • Training
  • Other services typically as, Technical Support, Integrated Operations, Re-engineering and Optimizing of Equipment   and Systems

The agreement is valid for three years with an option for two plus two year’s extension period.

Eureka Pumps AS is a Norwegian pump supplier with more than 35 years of experience in the oil and gas industry, offering a range of pumps and generator sets that covers a majority of applications. Eureka supplies to new builds and operates advanced maintenance and service. The company also offers services for upgrading, modification, equipment testing, installation and commissioning.

Eureka Pumps is a market leader among companies operating on the Norwegian Continental shelf, and is also present in international markets with selected applications, based on own technology. Eureka’s main office is at Lysaker, and has branch offices at strategic locations along the Norwegian coast. Eureka also has offices in St.Johns, Houston, Busan, Kuala Lumpur and Perth.

Eureka Pumps is part of ALIGN. ALIGN is a market leader within delivery, maintenance and modifications of safety and production critical solutions in the Norwegian and International oil and gas markets. ALIGN is a “turn key” supplier of firefighting solutions, including fire pump systems, emergency generators, safety automation and active firefighting systems.

Contact:
Øystein Solberg, Director After Market, Eureka Pumps AS, oystein.solberg@eureka.no
Telephone +47 913 26 096

Or:
Jon Kjetil Jutulstad, COO Eureka Pumps AS, jkj@eureka.no
Telephone +47 928 40 840

Lysaker October 30th 2014

Eureka Pumps has opened sales office in Kuala Lumpur, Malaysia

Categories: News
Comments Off on Eureka Pumps has opened sales office in Kuala Lumpur, Malaysia

Etiqa_Twins_thumbTo further strengthen our international activities, Eureka Pumps has opened up a sales office in Kuala Lumpur, which will serve the South East Asian market.

Eureka Pumps recognizes the market potential in the region and sees it as strategically important to have a local presences in South East Asia. Our efforts have already been awarded with Eureka’s first contract in the region, the Firewater System and Seawater Lift pumps to the Malaysian Bergading CPP project!

 

Eureka Pumps at ONS 2014

Categories: News
Comments Off on Eureka Pumps at ONS 2014

ONS 2014.5.2ONS 2014.7.1ONS.2014.10.1

 

Eureka Pumps participated at ONS 2014 at the common Align stand in Hall M.
The location of the stand and the decoration of it was excellent and the visit at the booth was very good.

The private evening event comprising of the famous Norwegian artist Morten Abel was a success where more than 200 clients, partners, suppliers and Align colleagues participated.
ONS is a world leading event for the international energy industry and comprises an exhibition, conference and festival. ONS was first held in 1974 and takes place every second year in Stavanger, Norway.

Next exhibition event for Eureka Pumps is Offshore Korea November 12th-14th 2014.

 

 

 

Eureka Pumps has secured their first major project for Malaysia

Categories: News
Comments Off on Eureka Pumps has secured their first major project for Malaysia

Bergading

Eureka Pumps has secured their first major project for Malaysia with Hess E&P Malaysia. Eureka Pumps will deliver 2 off containerised angle gear FW pump packages and 3 off submersible SWL pump packages to the Bergading Central Processing Platform which will be constructed by HHI in Ulsan, Korea.

Both Hess E&P Malaysia and PETRONAS are joint owners of the project and a mandatory requirement of the project was meeting the PETRONAS licence conditions, which is possible through our agency agreement in the territory, Eureka Efektif Sdn Bhd.

Bergading is strategic for Eureka as the company has long term plans for the future growth of this market and it was key to establish some success with this project for the development of the region. To support this project Eureka has mobilised people from Norway to work closely with our agent in supporting the local project management needs of HHI & Aker Engineering project team in Kuala Lumpur and in doing so has establish a small sales office, Eureka Pumps Malaysia based in KL.

The Bergading project represents our first installation for Malaysia, our first reference with PETRONAS and first contract award with Hess.

Eureka Pumps awarded contract on the White Rose Project

Categories: News
Comments Off on Eureka Pumps awarded contract on the White Rose Project

White Rose

Expectations have been high for the WREP (White Rose Extension Project), and Eureka has landed one contract.

This contract,  for an Emergency Genset, 2.5 MW Leroy Somer/MTU in a SS sided container, has been awarded us from Wood Group/Mustang in Canada.

Delivery is pending upon topside contract award (GoM/Korea/China), and will take place in summer of 2015.

This project has been very much dependent upon Newfoundland & Labrador content, and Eureka has been positive to these requirements, though this contract will be fully completed at our sites in Norway.

Husky is the operator and majority owner of the White Rose field and satellite extensions.

The WHP will consist of a concrete gravity structure (CGS) with a topsides, including drilling facilities, wellheads and support services such as accommodations for up to 144 persons, utilities, flare boom and a helideck. The primary function of the WHP will be drilling. There will be no oil storage in the CGS. All well fluids will be transported via subsea flowlines to the SeaRose FPSO for processing, storage and offloading.

The CGS will be constructed in a purpose-built graving dock at Argentia, Newfoundland and Labrador and the topsides structure will be fabricated in an existing fabrication yard(s). The completed WHP will be installed in the western portion of the White Rose field and tied back to the SeaRose FPSO.

Eureka Pumps AS Opening Canadian Operation in St. John’s

Categories: News
Comments Off on Eureka Pumps AS Opening Canadian Operation in St. John’s

Norway’s EUREKA PUMPS AS Opening Canadian Operation in St. John’s

St. John’s March April 2, 2014– – Today EUREKA PUMPS AS of Norway, in association with Pennecon Energy Technical Services Limited, announced the opening of their new Canadian office in St. John’s, Newfoundland and Labrador. EUREKA PUMPS NFLD Ltd is beginning with sales and project management, and plans to expand to include supervision of EUREKA’s After Sales Service activities in the region.

Building on each other’s expertise and regional opportunities, Pennecon and EUREKA PUMPS are working together to expand capacity and innovation in this part of the world. Pennecon is a Canadian leader in major project management, installation, construction and commissioning, on land and offshore, and is among the most respected multi-discipline construction organizations in Canada. Pennecon is looking to build on EUREKA’s and Norway’s expertise, innovation and experience in drilling for oil offshore.

EUREKA PUMPS AS has been in operation for over a hundred years. As a pump supplier with more than 35 years of experience in the oil and gas industry, offering a wide range of pumps and generator sets, EUREKA is a market leader among companies operating on the Norwegian Continental Shelf. It supplied over 3000 units to the North Sea Operators alone, and is active in international markets with several projects based on its own innovations and technology. EUREKA has won contracts for the Hebron project off Newfoundland and is looking to expand deliveries in this region with its high calibre fire water pumps, seawater lift pumps, emergency generator sets, and sea water injection pump systems.

Pennecon Chief Executive Officer Larry Puddister, P.Eng. welcomes EUREKA into their shared offices on Water Street. “Eureka has succeeded working with Norway’s NORSOK petroleum industry standards, some of the highest in the world. We want to emulate Norway’s rapid growth from a fishing economy to a global leader in oil & gas and a cold ocean leader with over thousands of active wells in the North Sea. We look forward to expanding EUREKA’s presence here as an original equipment manufacturer capable of serving the offshore from here in our province.”

Mr. Jarle Tautra serves as General Manager and CEO of EUREKA PUMPS AS at Align. “We see Newfoundland and Labrador as the main point of entry to the global sub-arctic, the next frontier in oil field development. St. John’s and the Avalon region is a centre of concentrated infrastructure and innovation with a fresh smart approach to offshore development. It reminds me of Norway.” He added, “The growth of Eureka parallels growth opportunities for NL businesses. We believe partnering for local efficiencies. We are prepared to engage in local innovation and advanced learning.”

Along with opening a local office, Rob Strong, a well-known local business person active in the offshore oil industry since 1980, has joined the Newfoundland Company as a director and will assist Eureka as they establish their presence in this exciting new market place.

 

Contact:
Jarle Tautra, General Manager and CEO EUREKA PUMPS AS
Magnus Poulssons vei 7, NO-1366 Lysaker, Norway
Email: jarle.tautra@eureka.no

Or

German Nilsen, Sales Manager Americas
EUREKA PUMPS AMERICAS, INC
8558 Katy Freeway, Suite 100, Houston TX 77024
T: +1 281 310 5407, C: +1 832 274 7819
Email: german.nilsen@eureka.no

 

 

EUREKA AWARDED FRAME AGREEMENT WITH LUNDIN NORWAY FOR EDVARD GRIEG

Categories: News
Comments Off on EUREKA AWARDED FRAME AGREEMENT WITH LUNDIN NORWAY FOR EDVARD GRIEG

Edvard_GriegEureka Pumps AS has been awarded an overall service contract for all pumps, pump systems and diesel machines from Lundin Norway AS. The Frame Agreement is related to scope of work on the new built offshore production facility named Edvard Grieg.

Eureka shall provide support to Lundin Norway’s offshore and onshore organization regarding service, overhaul and repair of diesel engines, all pumps, mechanical seals and related equipment, including but not limited to the following services:

• Installation, commissioning and start-up assistance
• On-site services
• Onshore services
• Spare parts
• Training
• Other services typically as, Technical Support, Integrated Operations, Re-engineering, Optimizing of Equipment and Systems, Storage and handling of Special Tools and Lifting Equipment.

LundinThe agreement is valid for four years with an option for two plus two years extension period.

Contact:
Øystein Solberg, Director After Market, Øystein.Solberg@eureka.no
Telephone +47 913 26 096

Or

Jon Kjetil Jutulstad, COO, jkj@eureka.no
Telephone +47 928 40 840

NEW SERVICE CENTRE IN KRISTIANSUND

Categories: News
Comments Off on NEW SERVICE CENTRE IN KRISTIANSUND

Opening ceremony March 27

Eureka Pumps opened a brand new service center in Kristiansund March 27th 2014. An opening ceremony was held with invited clients, suppliers and Eureka employees. The mayor of Kristiansund congratulated Eureka and spoke about the importance for the local community that Eureka invested in facilties and labour. Read more